Bicentennial Park

Bicentennial Park

Bicentennial Park

Corydon, IN

Bicentennial Park is in the heart of downtown Corydon, IN.  This project was a vision of the Town of Corydon and made possible by the Stellar Communities designation. This project involved transforming an old parking lot into a beautiful green space that includes signature pavers, seat walls, limestone art walls, water fountains, and an open-air polygon structure.

#image_title

INDOT Bridge-Harrison County

INDOT Bridge

Harrison County (B-40416)

As part of project B-40416, C&R Construction undertook a comprehensive bridge deck replacement and reinforced concrete arch rehabilitation in Harrison County. The project supported the structural integrity of a reinforced concrete arch originally built in 1937. The work involved removal and replacement of deteriorated sections of the arch to ensure long-term functionality and safety. This bridge is located over Crandall Branch Creek.

#image_title

Indian Creek Trail

Indian Creek Trail-Phase 3

The Indian Creek Trail Phase 3 project completed the final 1.2-mile stretch of asphalt and concrete trail, connecting downtown Corydon to Hayswood Park. A key feature of the project included the installation of a 250-foot, 3-span bridge relocated from its original site. CLR out of Vincennes, Indiana performed historic truss repairs and the relocation. C&R Construction installed 9,000 square feet of modular block wall along the creek to develop a pedestrian underpass beneath State Road 62. The trail was completed with a variety of wood fencing and railing. Despite significant rainfall during the project, the work was completed ahead of schedule.

#image_title

Amazon Facility

Amazon Facility Project

C&R Construction was responsible for significant site development work at an Amazon facility. The project included installation of 46,000 square yards of heavy-duty paving with fine grading and 17,000 square yards of light-duty paving with fine grading. Crews also completed 2,000 linear feet of roadway preparation and paving, as well as 11,500 feet of concrete curbs and associated grading. This infrastructure work was critical to supporting the facility’s logistics operations.