![tee road tee bridge](https://i0.wp.com/c-rconstruction.s3.amazonaws.com/wp-content/uploads/2019/03/tee-road-.jpg?resize=640%2C481&ssl=1)
C&R Construction installed two new concrete structures carrying Tee Road over Brush Heap Creek and an adjoining tributary. The project consisted of rock removal, reinforced concrete abutments, and designing/constructing reinforced flat slab bridge deck. This project was constructed during the winter months and heavy rain events, requiring C&R to protect the development from heavy flooding.