This project was a bridge replacement plan for the City of New Albany Flood Control Department, which carries Franklin Drive over Trinity Run Creek. This project had to be completed without entering the stream and required shoring and support to portions of the existing substructure. This project included erecting a modular wall along Trinity Run Creek and a concrete architectural barrier wall. C&R Construction worked with the business on a cost savings proposal to redesign the superstructure, which resulted in shorter road closure time and significant cost savings.